H3c-technologies H3C S9500E Series Switches Manuel d'utilisateur Page 43

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 154
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 42
33
NOTE:
If the screw holes on the mounting brackets cannot align with the cage nuts on the rack, check that the
bottom edge of the slide rail aligns with the middle of the narrowest metal area between holes and that the
cage nuts are installed in the correct holes.
Verifying the installation
After the installation is completed, check the installation against the following checklist. Make sure all
check results are positive.
Table 11 Installation checklist
Item
Result
Remarks
Yes
No
The mounting brackets are firmly fixed onto the switch.
The switch is installed in the right position.
The mounting brackets on the switch are firmly fixed onto the rack.
There are enough spaces for dissipation around the switch.
Grounding the switch
W
ARNING!
For the safety of operators and equipment, securely ground the switch. Make sure the resistance readin
g
between the switch chassis and the ground is less than 1 ohm.
CAUTION:
Connect the grounding cable to the earthing system in the equipment room. Do not connect it to a fire main
or lightning rod.
Most racks are equipped with a grounding strip. You can connect the yellow-green grounding cable of
the switch to the grounding strip.
NOTE:
Use the supplied grounding cable (CAT 6 cable with dual-hole OT terminals).
To connect the grounding cable:
1. Remove the two grounding screws from the switch chassis.
2. Use the grounding screws to attach one end of the grounding cable to the chassis.
3. Connect the other end of the grounding cable to the grounding strip of the rack in the same way.
Vue de la page 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 153 154

Commentaires sur ces manuels

Pas de commentaire