H3c-technologies H3C SecPath L5000-C Load Balancing Device Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Sécurité H3c-technologies H3C SecPath L5000-C Load Balancing Device. H3C Technologies H3C SecPath L5000-C Load Balancing Device User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 4
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Bail latch(required)
电源卡钩(标配)
M4 countersunk-head
screw (required)
M4沉头螺钉(标配)
Mounting brackets
and cable management
brackets (required)
挂耳(标配)
Rubber pads
(required)
胶垫贴(标配)
Tool list 工具参考
Installation accessories 安装附件介绍
Grounding cable
(required)
地线(标配)
Cage nut
(user supplied)
浮动螺母(用户自备)
M6 screw
(user supplied)
M6 螺钉(用户自备)
Removable cable tie
(user supplied)
可拆卸式扎带(用户自备)
Phillips
screwdriver
十字螺丝刀
Needle-nose
pliers
尖嘴钳
Wire-stripping
pliers
剥线钳
Diagonal pliers
斜口钳
ESD-preventive wrist strap
防静电腕带
Marker
记号笔
1
Flat-blade
screwdriver
一字螺丝刀
Wire crimper
压线钳
Wear an ESD-preventive wrist strap, and make sure the wrist strap makes
good skin contact and is well grounded.
操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防静电
腕带已经良好接地。
Airflow of the LB device 设备的风道设
Left-to-right airflow aisle.
设备采用左进右出的风道设计
Make sure the air inlet and outlet vents are not blocked and the installation
site has a good ventilation system.
请确保设备的进、出风孔不被遮挡,并将设备安装在具有良好通风散热系
统的环境中。
2
Mounting the LB device to a workbench 安装设备到工作台
The installation tools are not provided with the LB device. Prepare them
yourself.
设备不随机提供安装工具,请用户根据实际安装需求自备安装工具。
Make sure the workbench is sturdy and correctly grounded.
Do not place heavy objects on the LB device.
保证工作台的平稳与良好接地,并且不要在设备上放置重物。
Attach the rubber feet to the four
round holes in the chassis bottom.
Place the LB device with upside up
on the workbench. 粘贴胶垫到设备
底部,将带胶垫贴的设备平放到工
作台上
Vue de la page 0
1 2 3 4

Résumé du contenu

Page 1 - Tool list 工具参考

Bail latch(required)电源卡钩(标配)M4 countersunk-head screw (required)M4沉头螺钉(标配) Mounting brackets and cable management brackets (required)挂耳(标配) Rubber

Page 2

5 Connecting the grounding cable 连接保护地线+ Installing an interface card 安装接口板1. Remove the filler panel from the interface card slot.拆卸接口板槽位假面板2. In

Page 3 - 服务器负载均衡基本配置

ItemCommandRemarksserver-farm-name { | | } [ mask ] { | | }min-number max-numberlower-percentage upper-percentage { | | }real-ser

Page 4 - Configuration procedure

Server load balancing configuration exampleServer A, Server B, and Server C provide FTP services, and are in descending order of hardware configu

Commentaires sur ces manuels

Pas de commentaire